ONGC Floats Tender for Solar Projects worth 5 MW at its Hazira Site in Gujarat
The projects must be installed on a lump sum turnkey basis along with seven years of operation and maintenance at ONGC Hazira in Surat, Gujarat. The contract period for this tender is 12 months
January 09, 2020. By News Bureau
![](images/noticias/vyAu0e6pY9kjoGykYZeQNCwCcSPV8VFuW1t2vXOs8yWDl7bZsNcr0.jpg)
The Oil and Natural Gas Corporation Limited (ONGC) has announced that it has floated a 5 MW tender along with seven years of operation and maintenance (O&M) at its premises in the state of Gujarat.
The last date for the submission of bids is February 11, 2020, while a pre-bid conference will be held on January 20, 2020.
The projects must be installed on a lump sum turnkey basis along with seven years of operation and maintenance at ONGC Hazira in Surat, Gujarat. The contract period for this tender is 12 months.
The interested bidders need to furnish ₹3.6 million ($49,895) as the earnest money deposit (EMD).
The scope of work includes project management, pre-engineering surveys, detailed design and engineering, procurement, supply, storage, dismantling, modification of existing facilities, and hydro-testing.
ONGC has declared several solar tenders in the previous year for captive consumption.
please contact: contact@energetica-india.net.