Home › Renewable energy ›JSW Energy and SJVN Sign PPA for 700 MW of ISTS-Connected Solar Capacity
JSW Energy and SJVN Sign PPA for 700 MW of ISTS-Connected Solar Capacity
The Company aims to reach 20 GW generation capacity and 40 GWh of energy storage.
July 01, 2024. By News Bureau
JSW Renew Energy Limited has signed Power Purchase Agreement (PPA) with SJVN Limited for ISTS-connected solar capacity of 700 MW. The project is located in Rajasthan and is expected to be commissioned in next 24 months.
The total locked-in capacity of the company stands at 13.9 GW. The PPA is signed for supply of power for a period of 25 years with a tariff of INR 2.52/KWh. JSW Energy has total locked-in generation capacity of 13.9 GW comprising of 7.3 GW operational, 2.6 GW under-construction across wind, thermal and hydro and RE pipeline of 4.0 GW (PPAs signed for 2.0 GW).
The company also has 3.4 GWh of locked-in energy storage capacity through battery energy storage system and hydro pumped storage project. JSW Energy intends to reach 20 GW of generation capacity and 40 GWh of energy storage capacity by 2030 and has set an ambitious objective of becoming carbon neutral by 2050.
The total locked-in capacity of the company stands at 13.9 GW. The PPA is signed for supply of power for a period of 25 years with a tariff of INR 2.52/KWh. JSW Energy has total locked-in generation capacity of 13.9 GW comprising of 7.3 GW operational, 2.6 GW under-construction across wind, thermal and hydro and RE pipeline of 4.0 GW (PPAs signed for 2.0 GW).
The company also has 3.4 GWh of locked-in energy storage capacity through battery energy storage system and hydro pumped storage project. JSW Energy intends to reach 20 GW of generation capacity and 40 GWh of energy storage capacity by 2030 and has set an ambitious objective of becoming carbon neutral by 2050.
If you want to cooperate with us and would like to reuse some of our content,
please contact: contact@energetica-india.net.
please contact: contact@energetica-india.net.