TAG: " Wind Turbine Installation Vessel"

News

Havfram Wind Expands its Fleet with Order for Second Wind Turbine Installation Vessel

Havfram Wind has ordered a second state-of-the-art Wind Turbine Installation Vessel (WTIV). The order represents the first optional vessel in the existing shipbuilding contract with CIMC Raffles, and the vessel design will be similar to the first GustoMSC NG20000X Jack-Up vessel currently under construction.

Wind Turbine Installation Vessel | April 19, 2023 | By News Bureau 1657

Articles

This category has no news at the moment.

Interviews

This category has no news at the moment.


 
 
Next events
 
 
Last interviews
 
Follow us