TAG: "transmission-level projects"
News
RECDCL Hands Over 2 SPVs to Evacuate 3.5 GW RE Power from Rajasthan
REC Power Development and Consulting Ltd. has transferred two project-specific SPVs, Rajasthan IV 4A and 4B Power Transmission Ltd., to Power Grid Corporation of India Ltd. and Dineshchandra R. Agrawal Infracon Pvt. Ltd., respectively, for the evacuation of 3.5 GW RE power from Rajasthan Renewable Energy Zone.
Transmission-level Projects | December 31, 2024 | By Mrinmoy Dey | 442
Tata Power Acquires Transmission SPV in Odisha for INR 18.56 Crore from RECPDCL
Tata Power has acquired a 100 percent stake in transmission SPV ERES-XXXIX Power Transmission Ltd. from REC Power Development and Consultancy Ltd. for INR 18.56 crore to establish a key transmission system in Odisha.
Transmission-level Projects | November 15, 2024 | By Mrinmoy Dey | 795
POWERGRID Acquires 2 Transmission Projects in Rajasthan for INR 36.94 Crore
Power Grid Corporation of India has acquired to transmission project SPVs to evacuate 6 GW of renewable energy from Rajasthan REZ Ph-IV (Part-3) [Bikaner complex] at a combined value of INR 36.94 crore from REC Power Development and Consultancy Ltd. (RECPDCL).
Transmission-level Projects | November 12, 2024 | By Mrinmoy Dey | 848
RECPCDL Invites Bids to Evacuate 4 GW RE Power from Rajasthan
REC Power Development and Consultancy has issued a request for proposal for the selection of a transmission service provider through the TBCB process to establish ISTS for evacuation of power from Rajasthan REZ Ph-V (Part-1: 4 GW) [Sirohi/Nagaur] Complex.
Transmission-level Projects | September 30, 2024 | By Mrinmoy Dey | 584
POWERGRID Bags ISTS Project in Gujarat
Power Grid Corporation of India has announced that it has been declared a successful bidder for setting up an inter-state transmission system project in Gujarat.
Transmission-level Projects | September 13, 2024 | By Mrinmoy Dey | 724
NLC Looking for QCA Services for 1.4 GW of Solar and Wind Plants
The QCA will perpetuate the transmission of plant-level data and other needed data to the state load dispatch center (SLDC), apart from facilitating other services.
Transmission-level Projects | May 24, 2023 | By EI News Network | 2017
Broad Reach Brings 2x100 MW Battery Storage Projects Online
Broad Reach Power LLC, announced its first two transmission-level projects, North Fork and Bat Cave, are online and placed in service with ERCOT.
Transmission-level Projects | November 03, 2021 | By News Bureau | 2588
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.