TAG: " storage infrastructure"
News
SJVN Invites Bids for 6000 MWh RE Projects with Storage Systems
SJVN Ltd. has issued a Request for Selection (RfS) for 6000 MWh of assured peak power from ISTS-connected renewable energy projects with energy storage systems. Bids are due by January 24, 2025, with key requirements including document fees, EMD, and bid validity.
Storage Infrastructure | December 09, 2024 | By EI News Network | 2440
ESS Deploys First Iron Flow Battery for Sacramento Municipal Utility District
Under that agreement, ESS will deliver up to 200 megawatts (MW) / 2 GWh of iron flow LDES systems to SMUD. Once fully operational and paired with renewable energy, 2 GWh of iron flow battery systems are expected to enable the offset of approximately 284,000 metric tons of CO2 emissions annually from SMUD’s system.
Storage Infrastructure | September 13, 2023 | By EI News Network | 1523
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.