TAG: "PM KUSUM Yojana"
News
India’s Energy Demand to Double By 2032, Renewable Energy is Key: Pralhad Joshi
At the Regional Renewable Energy Workshop, Minister Pralhad Joshi emphasised India’s growing energy demand and the vital role of renewable energy in the nation’s growth. Rajasthan targets 125 GW by 2030, while India aims for 500 GW by 2030.
PM KUSUM Yojana | January 23, 2025 | By EI News Network | 880
Advait Energy Transitions to Integrate 40,000 Off-Grid Solar Pumps with SCADA in Karnataka
Ahmedabad-based Advait Energy Transitions has secured an order from Karnataka Renewable Energy Development to integrate 40,000 off-grid solar pumps with SCADA software under the PM KUSUM Component 'B' scheme.
PM KUSUM Yojana | January 20, 2025 | By Mrinmoy Dey | 271
Maharashtra Plans to Solarise 35 Lakh Agricultural Pumps by 2025 Under PM KUSUM: MNRE Minister
Maharashtra aims to solarise 35 lakh agricultural pumps by 2025 under the PM-KUSUM Scheme, showcasing its leadership in renewable energy initiatives, Union Minister for New and Renewable Energy Pralhad Joshi said at a regional workshop in Mumbai.
PM KUSUM Yojana | January 10, 2025 | By Mrinmoy Dey | 503
MNRE Allocates Additional 5000 MW to Rajasthan Under PM KUSUM Component A
The Ministry of New and Renewable Energy (MNRE) has allocated an additional 5,000 MW capacity under Component A of the PM-KUSUM scheme to Rajasthan, marking a significant boost to the state’s renewable energy initiatives.
PM KUSUM Yojana | January 10, 2025 | By Mrinmoy Dey | 506
Solar Power Dominates India's RE Landscape with over 97 GW of Installed Capacity
As per MNRE data (December 31, 2024), India’s renewable energy capacity has reached 209 GW, with solar power leading at 97.8 GW, contributing nearly half the total. Ground-mounted solar accounts for 75.2 GW, and rooftop solar under the PM-Surya Ghar Yojna adds 15.6 GW. Wind power follows at 48.1 GW.
PM KUSUM Yojana | January 08, 2025 | By EI News Network | 364
Sahaj Solar Secures INR 46.64 Crore Order for Solar Water Pumping Systems Under PM-KUSUM
Ahmedabad-based Sahaj Solar Ltd. has received a Notice to Proceed (NTP) for installing off-grid standalone solar PV water pumping systems in Gujarat under an INR 46.64 crore contract from Dakshin Gujarat Vij Company Ltd. (DGVCL) under Component B of PM- KUSUM Scheme.
PM KUSUM Yojana | January 07, 2025 | By Mrinmoy Dey | 365
Jodhpur Discom Invites Expression of Interest to Develop 43.75 MW Solar Projects Under PM Kusum
Jodhpur Vidyut Vitran Nigam Ltd. (JDVVNL) has invited EOIs to set up decentralised solar power plants of 0.5 MW to 2 MW capacity, aggregating to 43.75 MW, to be connected on 33/11 kV sub-stations under PM-KUSUM Scheme Component A. Bid submission ends on January 22, 2025.
PM KUSUM Yojana | January 03, 2025 | By Mrinmoy Dey | 491
KLK Ventures Receives Letter of Empanelment for Off-Grid Solar Water Pumping Systems
This initiative, focused on sustainability and renewable energy, aims to revolutionize irrigation practices by providing reliable solar water pumps to farmers across Himachal Pradesh.
PM KUSUM Yojana | January 03, 2025 | By News Bureau | 367
Sahaj Solar Receives INR 36.42 Crore Order for Solarisation of Agricultural Pumps in Tripura
Sahaj Solar has received a letter of award (LoA) from Tripura Renewable Energy Development Agency (TREDA) under PM KUSUM Scheme (Component C) to solarise existing 2 HP grid-connected agriculture pumps in Tripura.
PM KUSUM Yojana | January 02, 2025 | By Mrinmoy Dey | 511
NGT Seeks Response from Centre Over Improper Solar Panel Disposal and Recycling
The NGT has directed the Centre and other authorities to address concerns over improper disposal and recycling of damaged solar panels. The petition highlights environmental risks from heavy metals, soil and water contamination, and the lack of infrastructure for safe disposal and recycling.
PM KUSUM Yojana | December 31, 2024 | By EI News Network | 527
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.