TAG: "MOP TBCB guidelines"
News
Government Revises TBCB Guidelines for Grid-Connected Solar PV Projects

The Ministry of Power (MoP) has amended Tariff-Based Competitive Bidding (TBCB) guidelines for solar PV projects, introducing location-specific bids, revised CUF penalties, faster PPA timelines, new financial instruments, enhanced technical standards, and stricter compliance with cybersecurity regulations.
MOP TBCB Guidelines | February 20, 2025 | By EI News Network | 754
MoP Amends TBCB Guidelines for Wind Power Projects

The Ministry of Power (MoP) amended Tariff-Based Competitive Bidding (TBCB) guidelines for procurement of power from grid-connected wind power projects, introducing location-specific bids, new financial instruments, stricter CUF compliance, and faster PPA timelines to enhance transparency and accelerate renewable energy deployment.
MOP TBCB Guidelines | February 20, 2025 | By EI News Network | 1088
MoP Amends Guidelines for TBCB to Procure Firm Power from RE Projects with Storage

The Ministry of Power (MoP) has amended guidelines for tariff-based competitive bidding (TBCB) to procure firm and dispatchable power from renewable energy projects with storage systems, introducing changes to approvals, technical criteria, penalties, and contract timelines.
MOP TBCB Guidelines | February 19, 2025 | By EI News Network | 631
MOP Unveils Draft Amendment to TBCB Guidelines for Grid-Connected Power Procurement

The Ministry of Power (MOP) has unveiled a draft amendment to the Tariff-Based Competitive Bidding (TBCB) guidelines, aimed at optimising the procurement of power from grid-connected renewable energy projects, including solar, wind, wind-solar hybrid, and dispatchable power with energy storage systems.
MOP TBCB Guidelines | October 29, 2024 | By EI News Network | 1465
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.