TAG: "Inter-State Transmission System network"
News
SECI Invites Bids for 400 MW ISTS-Connected Wind Projects

SECI has issued a tender for 400 MW wind projects, requiring bidders to have a net worth of INR 1.5 crore per MW. The minimum project size is 50 MW, with a 25-year PPA at a tariff determined through competitive bidding.
Inter-State Transmission System Network | March 20, 2025 | By EI News Network | 251
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.