TAG: "BN Peak Power-1"
News
JSW, Juniper, BN Peak Power-1 and Avaada Win MSEDCL’s 500 MW Wind-Solar Hybrid Auction

MSEDCL invited bids in March this year to procure 500 MW of wind-solar hybrid power on a long term basis from grid connected intrastate projects with an additional greenshoe option of up to 500 MW. The last date to submit the bids was April 4, 2024.
BN Peak Power-1 | July 11, 2024 | By News Bureau | 1331
Articles
This category has no news at the moment.
Interviews
This category has no news at the moment.